+49 (0) 231 46505-0 This email address is being protected from spambots. You need JavaScript enabled to view it.

Select your language

 

Bsullak Maschinenbau

Refurbishment of a production hall: Efficient heating support with LUBI Wall solar air system

 

Bsullak GmbH in Eltville, Hesse, offers high-quality CNC work as well as conventional milling and turning work.

Owner Andreas Bsullak wanted to put his company on a new footing in terms of energy. One of the reasons for this was his responsibility towards his employees and future generations.

He was looking for a complete energy-saving concept for the existing company building. This ranged from improving the thermal insulation of the façade to renewing the heating system. It was important for Andreas Bsullak to reduce energy consumption and costs. Due to the metalworking activities, another criterion was to improve the air quality in the production halls.

referenz bsullak lubi wall solar luftsystem kollektoren gogas goch dortmund

referenz bsullak lubi wall solar luftsystem kollektoren luftzufuhr gogas goch dortmund

GoGaS presented the LUBI Wall solar air system and Andreas Bsullak was enthusiastic about the idea. LUBI Wall supports the heating system consisting of three condensing dark radiators for heating and also ensures a significant improvement in air quality for heating and cooling.

The LUBI Wall solar air system installed consists of a collector area of 40 m² and provides fresh air for 1200 m² of hall space. LUBI Wall was installed on the south façade of the building and brings the sun's energy directly into the hall as warm air.

Andreas Bsullak is convinced. The investment pays off not only for him, but also for his employees and not least for our environment.

Renewable energies with LUBI Wall

The use of renewable energies with LUBI Wall results in considerable savings:
8.1 tons of CO2
4,050 m³ natural gas
1,800 € net energy costs p. a.